What bathroom waterproofing before tiling includes
- Checking the base, floor and walls and confirming they are free of cracks and loose areas
- Treating cracks and loose areas and levelling the surface before anything is applied
- Applying the waterproof layer to the full bathroom floor with attention to the slope towards the drain
- Waterproofing the wet-area walls to the required height, with focus on the areas most exposed to water
- Carefully treating internal corners, parapet edges and the junction between the floor and the walls
- Covering pipe openings and drain outlets within the layer to prevent water from entering at those points
From your call to the finished layer
- 1
Tell us the situation
Call or message us on WhatsApp and tell us the base is ready and when the tiler is due, so we know what the inspection and application will need.
- 2
Preparing and checking the surface
Before anything is applied, the base is checked, cleaned and any cracks or loose areas are treated, because a waterproof layer cannot compensate for a cracked base.
- 3
Applying the waterproof layer
The layer is applied to the bathroom floor and up the walls to the required height, with special treatment at internal corners, edges and around the pipe and drain openings.
- 4
Protection until the tiler arrives
After application the layer is left to set before tiling begins; the treated surface should not be walked on or loaded until that stage is complete.
Relax, the waterproofing comes before the tiles
- We apply the layer before tiling at the right time
- We treat corners, edges and pipe openings
- We check the base before applying anything
- We take your request by phone call or WhatsApp message
- The layer protects the concrete slab and the ceiling below
The service in Al Kilabiyah
In a town like Al Kilabiyah, many homes have bathrooms at different levels from the main floor, and are often near water tanks or under damp soil. The first check asks about the surface: are there cracks in the concrete, is the floor level or uneven, is moisture rising from under the floor? Then waterproofing of epoxy or bitumen is applied to the entire floor, walls up to a set height, and corners, with special care around drains and pipes.
Al Kilabiyah is a town in Al-Ahsa governorate in the Eastern Province.
In bathrooms at lower levels or near groundwater, the first check is for moisture rising from the soil beneath the building.
Our portfolio
What our customers say
- ★★★★★
شغلهم نظيف وسريعين ومحترمين الله يعطيهم العافيه
- ★★★★★
شغلهم كويس وناس ممتازه في اسرع وقت
- ★★★★★
شركة ممتازة تستحق التعامل معها بشكل مستمر
Reviews are shown as the customers wrote them, in Arabic.
Questions about Bathroom waterproofing before tiling in Al Kilabiyah
At a corner two surfaces meet at a right angle, and this joint is subject to slight movement as materials expand and contract. The cement bed alone does not close this joint well enough, and it stays an open path for water. The waterproof layer covers the joint and fills the corner before any tile is laid.
No. Water-resistant tiling materials slow water down but do not stop it completely, especially at the joints between tiles. Water that reaches the cement bed under the tiles builds up and leaks into the concrete slab and from there to the ceiling below. A dedicated waterproof layer under the tiles is the real barrier.
The floor carries standing water and faces constant pressure, so it needs a full waterproof layer with attention to the slope towards the drain. The walls face spray and splashed water, and it is usually enough to waterproof them to a height that covers the shower or basin area, with focus on the lower corners and pipe openings.
Because any work done after application, such as drilling an opening or fixing a pipe, breaks through the layer and destroys its continuity. All openings and pipes must be in their final position and the base must be level and dry before the waterproofing is applied; tiling then follows as the very next step.
Tell us the size of the bathroom, whether the base and surfaces are ready or if work is still ongoing, and when the tiler is expected. If there are cracks or pipe openings not yet treated, let us know. These details help us decide what needs attention before the layer is applied.
If you see any damp marks on old walls or around water pipes, or if the current floor has moisture or a musty smell, waterproofing is needed before new tiles. Call Al Raya before you level the floor.
Bathroom waterproofing prevents water coming in from the surface, but if the walls under the tiles have existing damp or salt, they may need treatment before waterproofing. The first check will decide that.