
Corrugated-sheet (shinko) insulation in Government Departments Complex 2nd District
In Government Departments Complex 2nd District, shinko sheets on roofs make heat and noise a daily problem. Al Raya covers the shinko with sprayed polyurethane foam, so heat drops and rain noise stops.
What shinko insulation includes
- Checking the sheets and identifying open laps and bolt holes before spraying
- Cleaning the surface, treating rust and securing loose panels to prepare for foam
- Spraying polyurethane foam onto the sheets so it flows into laps and holes and sets as a seamless layer
- Applying a finish coat over the foam to protect it from sunlight and breakdown
- Treating sun-facing shinko walls in the same way when that is part of the job
- Answering your questions about corrugated-sheet (shinko) insulation before the work starts
From your call to an insulated roof
- 1
Tell us what you have
Call or message us on WhatsApp and describe the sheet area, whether the problem is heat, leaks or both.
- 2
Preparing the surface
The sheets are cleaned, any loose panel is secured and rust is treated before spraying, because the foam layer needs a sound surface under it.
- 3
Spraying the foam
Foam is sprayed across the sheets in steady passes, expanding to fill laps and holes and setting as a continuous layer that insulates against heat and resists rain.
- 4
The protective coat
A finish coat is applied over the foam to protect it from sunlight and wear, because bare foam breaks down over time under ultraviolet rays.
Why foam suits metal sheets
- It flows into laps and bolt holes, leaving no gap
- A seamless layer with no joints or exposed edges
- Insulates against heat and reduces drum noise together
- We treat annexes, car shelters and corrugated roofs
- We take your request by phone call or WhatsApp message
The service in Government Departments Complex 2nd District
Homes in a district like this usually have shinko sheet roofs, metal that conducts heat from the sun all day and causes noise when rain falls. Insulating shinko means preparing and cleaning the surface, then spraying foam over all the sheets, joints and edges to form one continuous layer. The team checks the shinko first to be sure it is sound and safe to work on, because rust or holes affect how well the foam sticks.
Government Departments Complex 2nd District is a district in Al-Ahsa governorate in the Eastern Province, close to Al Hamra 1st District, Al Aziziyah 1st District and Al Hamra 2nd District.
Shinko conducts heat fast, so temperatures under it drop noticeably once covered with foam.
Our portfolio
What our customers say
- ★★★★★
شكرا على التواصل وصلو في اسرع وقت ممكن
- ★★★★★
شركة ممتازة تستحق التعامل معها بشكل مستمر
- ★★★★★
شركه ممتازه
Reviews are shown as the customers wrote them, in Arabic.
Questions about Corrugated-sheet (shinko) insulation in Government Departments Complex 2nd District
Spraying works from both sides depending on the situation. Spraying underneath insulates against heat, reduces noise inside the annex and stays protected from the sun by the sheets above. Spraying on top adds waterproofing and covers laps and holes. When the problem is both heat and leaks, the job often involves both sides.
The lap between two overlapping sheets is not automatically tight: heat expands the metal and cold contracts it, so laps move and small gaps open over time. Bolt holes also widen with repeated expansion. These entry points are not visible to the eye but they let water through, especially when rain comes with wind.
Yes. The foam bonds to the sheet and absorbs the vibration that turns raindrops into a drumming sound. The seamless layer stops the sheet resonating the way it does when bare. This is one of the noticeable changes for anyone who uses the annex or shelter regularly.
It suits the walls too. A shinko wall facing the sun absorbs heat and passes it straight inside, and its laps and bolt holes let in air and moisture just like the roof. Foam is sprayed onto the wall in the same way and a protective coat is added over it.
Tell us whether the problem is heat, leaks or both, whether the sheets are on the roof or the walls or both, and whether you can see rust, open laps or loose bolts. The clearer your description, the better we can work out what the surface needs before we visit.
Yes, if the sheets are sound with no major rust or holes. The roof is checked first to see the condition of the shinko, because damaged sheets may need repair before insulation.
Temperatures in the rooms below the roof will drop noticeably, and the noise from rain hitting the shinko will stop when it rains.
Corrugated-sheet (shinko) insulation in nearby areas


















