Al Raya
Pool renovation in Government Departments Complex 2nd District: An empty old pool with worn plaster and cracks and removed tiles at its edge

Pool renovation in Government Departments Complex 2nd District

Pool renovation in Government Departments Complex 2nd District restores a pool to reliable use after years of operation. Al Raya carries out thorough treatment of leaks and cracks instead of repeated patches.

What the service includes

What pool renovation includes

  • Emptying the pool and inspecting the full shell: walls, floor and edges
  • Locating cracks, areas of tile separation and points of water loss
  • Repairing cracks in the concrete shell and treating the surrounding area
  • Renewing tile joints or replacing broken and separated tiles
  • Preparing the surface and applying new lining, plaster or epoxy
  • Filling the pool and checking for water loss once renovation is complete
How we work

From your call to a renewed pool

  1. 1

    Describe what you see

    Call or WhatsApp us and tell us about the pool surface: visible cracks, separated tiles, water loss or worn plaster.

  2. 2

    Empty and inspect the shell

    The pool is emptied to expose the full shell, then the walls, floor and edges are checked to locate every crack and every area of damp before work starts.

  3. 3

    Repair the shell and joints

    Cracks are filled and the surrounding area treated, damaged tile joints are renewed or broken tiles replaced, and the surface is treated with the appropriate material before lining.

  4. 4

    Line and test the pool

    Once the surface is ready, the new lining, plaster or epoxy is applied according to the shell type, the pool is filled and checked for water loss.

Why Al Raya

Sound renovation starts from the shell

  • We inspect the full shell before any new layer
  • Treating cracks and joints is essential before any new surface
  • We use epoxy and plaster according to the surface type
  • We take your request by phone call or WhatsApp message
  • The cost depends on the pool's condition and size
About the area

The service in Government Departments Complex 2nd District

Pools in the district may be used year-round, putting constant pressure on walls and floor and exposing them to temperature changes. Fine cracks appear over time and let water through, usually with damp visible on surrounding floors and walls. Renovation starts with a full check of every internal surface, then removes damaged material and weak joints, treats cracks deeply, and reseals the entire interior with epoxy or bitumen. The first inspection sets the scope of the work.

Government Departments Complex 2nd District is a district in Al-Ahsa governorate in the Eastern Province, close to Al Hamra 1st District, Al Aziziyah 1st District and Al Hamra 2nd District.

Most pool leaks start at corners and joints between different surfaces, where pressure and movement are greatest.

Read about Pool renovation

Our work

Our portfolio

  • Cracked and bubbling paint along a wall edge
  • A white roof with an air conditioner and satellite dishes
  • A leak detection device with headphones in a case
  • The edge of a roof insulated in white beside a building under a clear sky
  • A roof covered in a smooth white insulation layer with a small dome behind it
  • A hole in a broken wall exposing pipes and wires
Reviews

What our customers say

  • ★★★★★

    شكرا على التواصل وصلو في اسرع وقت ممكن

  • ★★★★★

    شغلهم ميه ميه يشكرو عليه

  • ★★★★★

    شغلهم كويس وناس ممتازه في اسرع وقت

Reviews are shown as the customers wrote them, in Arabic.

Questions

Questions about Pool renovation in Government Departments Complex 2nd District

Patching treats a single crack without looking at the whole shell, and it is right when the problem is limited and recent. Renovation means emptying the pool, inspecting the full shell and repairing all cracks and joints before a new surface is applied. When cracks return or the pool loses water in several places, renovation is the right choice.

Yes, full emptying is necessary. The shell cannot be inspected, cracks repaired or the surface prepared while it is under water. Emptying is what first lets you see the real problems in the walls, floor and edges, and without it any repair stays incomplete.

The material depends on the shell condition and surface type. Plaster is the traditional layer that lines a concrete shell. Epoxy is a hard resin applied over a prepared surface and resists moisture. Polyurethane foam is a sprayed foam layer used for thermal and waterproofing work. The choice between these materials depends on assessing the pool's condition.

Yes, re-tiling is part of renovation when tiles are broken or have separated from the wall. Separated tiles usually point to a problem in the joints or the layer behind them, so that layer is treated first before new tiles are laid, otherwise the new tiles will separate in turn.

Tell us the pool's approximate age and describe the current surface: whether the plaster is worn or cracked, whether tiles are separated or broken, and whether you have noticed the water level dropping. The clearer your description, the better we can identify what is needed before the visit.

Yes, thorough renovation requires draining the pool so every internal surface can be checked and treated. After cracks, joints and sealing are done, the pool is refilled once everything is sound.

Say the pool's approximate size, whether cracks or water leaks are visible on surrounding floors or walls, whether there was an earlier repair and when, and send photos of affected areas.

Nearby areas

Pool renovation in nearby areas

Sunset over villa roofs and palm trees

Describe your pool to us

Call or WhatsApp us and tell us what you see on the surface and walls.

Call nowWhatsApp