Al Raya
Pool waterproofing before tiling in Haradh: A pool shell corner and skimmer opening sealed with grey sealant before tiling

Pool waterproofing before tiling in Haradh

Pool waterproofing before tiling in Haradh protects the walls and floor from water seeping through cracks and joints. The waterproofing is applied to the finished concrete before tiling, so the structure stays sound beneath the water.

What the service includes

What pool waterproofing before tiling includes

  • Inspecting the concrete surface and identifying cracks and spots that need prior treatment
  • Preparing the walls and floor by cleaning the surface and removing loose material or oils
  • Treating corners and concrete joints with a material that can absorb movement
  • Sealing pipe openings, inlets and fittings set into the pool walls and floor
  • Applying the waterproof layer across the walls and the floor to cover the full pool area
  • Handing over the pool ready for tiling once the waterproof layer is complete
How we work

From your call to the start of the work

  1. 1

    Tell us the pool's condition

    Call or message us on WhatsApp and tell us whether the concrete is finished and whether pipe openings or fittings are in place, so we know what the job involves.

  2. 2

    Preparing the concrete surface

    The surface is cleaned of dust, oils and any loose material. Small cracks are treated before the layer goes on, because a waterproof coat on an unsound surface cannot do its job.

  3. 3

    Sealing joints and openings

    Corners between the wall and floor, concrete joints and every pipe opening are treated carefully, as these are the points most exposed to leakage under water pressure.

  4. 4

    Applying the waterproof layer

    Once the surface is ready, the waterproof material is applied across the walls and the floor to cover the full area, and tiling can then go ahead.

Why Al Raya

This is the right time to waterproof

  • The concrete surface is exposed and ready to treat
  • No tiles to lift and no breaking later
  • Joints and openings are sealed before the tiles cover them
  • The waterproofing sits in the right layer between the concrete and the tiles
  • We take your request by phone call or WhatsApp message
About the area

The service in Haradh

In a town like Haradh, a pool usually has concrete walls and a floor, which may show small cracks or joints between sections. Water seeks the tiniest opening to penetrate the concrete layer, weakening the structure and causing steel corrosion and long-term damage. The team inspects the walls, floor, corners and joints first, then cleans the surface and applies a waterproof layer in epoxy or bitumen that covers every area exposed to water, including joints and cracks. After the initial check, the team decides the right waterproofing method based on the surface condition and the design.

Haradh is a town in Al-Ahsa governorate in the Eastern Province, close to Ash Shuruq, Al Ekhaa and Ar Rabie.

The joints between floor sections and the corners between walls and floor are the most common leak points in pools.

Read about Pool waterproofing before tiling

Our work

Our portfolio

  • A hand scraping damp mortar from between small stones on a surface
  • Peeling paint on an exterior wall beside a pipe
  • Cracked and bubbling paint along a wall edge
  • A white roof with an air conditioner and satellite dishes
  • A leak detection device with headphones in a case
  • The edge of a roof insulated in white beside a building under a clear sky
Reviews

What our customers say

  • ★★★★★

    شغلهم ميه ميه يشكرو عليه

  • ★★★★★

    شركة ممتازة تستحق التعامل معها بشكل مستمر

  • ★★★★★

    شكرا على التواصل السريع

Reviews are shown as the customers wrote them, in Arabic.

Questions

Questions about Pool waterproofing before tiling in Haradh

The work is possible but very different: the waterproof layer will not sit between the concrete and the tiles where it belongs, and the walls may need treatment from inside or tiles lifted in the damaged areas. This is why waterproofing before tiling is simpler and less complicated than any later option.

Flexible cement-based coats or epoxy resins are commonly used, and the right material depends on the nature of the concrete, the pool's shape and its size. Each material has its own preparation and application method that affects how well it holds water under pressure.

Because water presses in two directions at once in a corner, and it is where two different concrete sections meet. Any slight movement in the structure opens the corner before anywhere else, so it needs extra treatment with a filler that can absorb movement before the main waterproof layer goes on.

Yes, new concrete needs to finish curing before the waterproof material is applied. Applying it to concrete that has not fully set affects how well the material bonds to the surface and weakens the layer. The time needed varies with the thickness of the concrete and the weather conditions.

Tell us the approximate dimensions of the pool, whether the concrete is finished and the pipe openings cast, and whether there are any visible cracks in the walls or the floor. These details help us judge the nature of the work and which waterproofing materials suit your pool.

Yes, waterproofing before tiling is the essential step to protect the concrete from water. If the surface is left unsealed, water will seep through cracks and joints and weaken the structure over time.

We check the concrete for cracks, joints or weak areas, the corners between walls and floor, and the surface condition for cleanliness and dryness, because a sound, dry surface is necessary for the waterproofing to bond properly.

Nearby areas

Pool waterproofing before tiling in nearby areas

Sunset over villa roofs and palm trees

Message us before the tiles go down

Call or WhatsApp us and describe the shell's condition now.

Call nowWhatsApp