Al Raya
Bitumen roof waterproofing in Mansubi Al Taleem 2nd District: Black bitumen membrane strips with overlapping seams turned up at a parapet

Bitumen roof waterproofing in Mansubi Al Taleem 2nd District

In Mansubi Al Taleem 2nd District, concrete flat roofs need tight protection from water and heat. Bitumen seals the roof with a continuous layer bonded at every joint and crack, stopping water from seeping in.

What the service includes

What bitumen roof waterproofing includes

  • Checking the roof surface and identifying points that need extra preparation before the rolls go down
  • Cleaning the surface and removing failing layers and dirt that would weaken the bond
  • Laying bitumen rolls with enough overlap at every seam between one strip and the next
  • Sealing the roll edges at the parapet on both the horizontal and vertical faces
  • Treating the specific points around drain bases, pipes and AC unit stands
  • Confirming the layer is continuous with no break from the centre to every edge
How we work

From your call to the sealed roof

  1. 1

    Describe what you see

    Call or message us on WhatsApp and tell us what shows on your ceiling or roof surface. We will guide you to the next step.

  2. 2

    Preparing the surface first

    The job starts by cleaning the surface of dirt and failing layers, because a roll only bonds well to a clean, sound base.

  3. 3

    Laying and overlapping the rolls

    The rolls are laid in parallel strips and each strip overlaps the next at the edge, because the seam between two strips is the most vulnerable point in any bitumen covering.

  4. 4

    Sealing the edges and penetrations

    The membrane edges are sealed at the parapet and around every drain base, pipe and AC stand, because these specific points are where water most often enters.

Why Al Raya

Bitumen rolls suit your roof

  • We take your request by phone call or WhatsApp message
  • Seams are sealed, not left open
  • Parapet edges and drain bases receive particular care
  • The surface is prepared before the rolls go down
  • The rolls are laid in overlapping strips
About the area

The service in Mansubi Al Taleem 2nd District

Roofs on buildings in a district like Mansubi Al Taleem 2nd are usually flat concrete, with a parapet, joints between sections and roof tanks. These gaps and corners are where water pools in occasional rain, and where moisture enters from Al-Ahsa's salty ground. The roof is inspected first for cracks, joints and damp, then surfaces are cleaned and gaps filled, and bitumen rolls are precisely bonded over every joint, corner, tank, parapet base and drain.

Mansubi Al Taleem 2nd District is a district in Al-Ahsa governorate in the Eastern Province, close to Sports City, Al Danah District and Mansubi Al Taleem 1st District.

Bitumen needs the most care along the parapet, around the tank base and on every joint, because water pools there before spreading.

Read about Bitumen roof waterproofing

Our work

Our portfolio

  • A building roof covered in white insulation
  • A roof covered in white insulation with a worker in the distance
  • A worker rolling white insulation coating onto a villa roof
  • A white roof with an air conditioner and satellite dishes
  • The edge of a roof insulated in white beside a building under a clear sky
  • A roof covered in a smooth white insulation layer with a small dome behind it
Reviews

What our customers say

  • ★★★★★

    شغلهم ميه ميه يشكرو عليه

  • ★★★★★

    شكرا على التواصل السريع

  • ★★★★★

    شركه ممتاز شغلهم كويس ويعطيهم العافيه

Reviews are shown as the customers wrote them, in Arabic.

Questions

Questions about Bitumen roof waterproofing in Mansubi Al Taleem 2nd District

Bitumen rolls suit flat concrete roofs in most cases. A very sloped roof or one finished with tiles needs a different assessment. The surface should be sound and free of deep cracking before the rolls go down; otherwise it needs extra preparation first.

The middle of the roof is usually flat and continuous. At the parapet, the horizontal membrane meets the vertical wall, forming a joint that moves with heat expansion and contraction. If that edge is not sealed well, water usually finds its way in there.

Clean, sound concrete usually needs a primer coat to open its pores and improve how the roll bonds to it. Laying a roll on an unprepared surface weakens the bond and leaves the layer prone to separating over time, especially with the temperature range.

The seam between two strips breaks the continuity of the waterproof layer. If the strips do not overlap enough and the edge is not pressed down until it bonds, a fine gap remains. That gap opens in summer heat and closes again, and water finds its way through it in every rainfall.

Bitumen suits a flat concrete roof that lets water in and needs a flexible protective layer that handles thermal expansion. If the problem is mainly heat with no visible water entry, another material may be more suitable. An initial assessment of the roof is what determines the right choice.

The roof is checked for cracks, joints between sections, parapet and tank condition, drains, and for damp or salts on the surface. Bitumen is bonded to a surface free of moisture, dirt and loose material.

Say where you see damp stains on the ceiling or upper walls, whether water leaks when it rains, whether the roof has visible tanks or joints, and send a roof photo on WhatsApp if possible.

Sunset over villa roofs and palm trees

Describe your roof and we start

Call or WhatsApp us and tell us what you see on the ceiling or the roof.

Call nowWhatsApp