
What bitumen roof waterproofing includes
- Checking the roof surface and identifying points that need extra preparation before the rolls go down
- Cleaning the surface and removing failing layers and dirt that would weaken the bond
- Laying bitumen rolls with enough overlap at every seam between one strip and the next
- Sealing the roll edges at the parapet on both the horizontal and vertical faces
- Treating the specific points around drain bases, pipes and AC unit stands
- Confirming the layer is continuous with no break from the centre to every edge
From your call to the sealed roof
- 1
Describe what you see
Call or message us on WhatsApp and tell us what shows on your ceiling or roof surface. We will guide you to the next step.
- 2
Preparing the surface first
The job starts by cleaning the surface of dirt and failing layers, because a roll only bonds well to a clean, sound base.
- 3
Laying and overlapping the rolls
The rolls are laid in parallel strips and each strip overlaps the next at the edge, because the seam between two strips is the most vulnerable point in any bitumen covering.
- 4
Sealing the edges and penetrations
The membrane edges are sealed at the parapet and around every drain base, pipe and AC stand, because these specific points are where water most often enters.
Bitumen rolls suit your roof
- We take your request by phone call or WhatsApp message
- Seams are sealed, not left open
- Parapet edges and drain bases receive particular care
- The surface is prepared before the rolls go down
- The rolls are laid in overlapping strips
The service in Haradh
In a town like Haradh, roofs usually have water tanks, drains and protective walls, each creating joints where water can pass. Upper walls and ceilings in top floors show damp stains first when leaks start. Bitumen rolls are carefully laid on a dry, clean roof and bonded at every joint and edge with extra layers. The first inspection confirms the roof is free of damp and large cracks, because any fault will remain under the bitumen.
Haradh is a town in Al-Ahsa governorate in the Eastern Province, close to Ash Shuruq, Al Ekhaa and Ar Rabie.
Water pools fastest around drain openings and along the roof-to-parapet joint, so these places need extra bitumen layers.
Our portfolio
What our customers say
- ★★★★★
شغلهم ميه ميه يشكرو عليه
- ★★★★★
شكرا على التواصل السريع
- ★★★★★
شركه ممتاز شغلهم كويس ويعطيهم العافيه
Reviews are shown as the customers wrote them, in Arabic.
Questions about Bitumen roof waterproofing in Haradh
Bitumen rolls suit flat concrete roofs in most cases. A very sloped roof or one finished with tiles needs a different assessment. The surface should be sound and free of deep cracking before the rolls go down; otherwise it needs extra preparation first.
The middle of the roof is usually flat and continuous. At the parapet, the horizontal membrane meets the vertical wall, forming a joint that moves with heat expansion and contraction. If that edge is not sealed well, water usually finds its way in there.
Clean, sound concrete usually needs a primer coat to open its pores and improve how the roll bonds to it. Laying a roll on an unprepared surface weakens the bond and leaves the layer prone to separating over time, especially with the temperature range.
The seam between two strips breaks the continuity of the waterproof layer. If the strips do not overlap enough and the edge is not pressed down until it bonds, a fine gap remains. That gap opens in summer heat and closes again, and water finds its way through it in every rainfall.
Bitumen suits a flat concrete roof that lets water in and needs a flexible protective layer that handles thermal expansion. If the problem is mainly heat with no visible water entry, another material may be more suitable. An initial assessment of the roof is what determines the right choice.
Damp stains on the ceiling after rain, musty smell in the top floor, or discolouration in upper walls. If you see any of these, the roof is leaking and needs checking by Al Raya.
No, the roof must be completely dry before bitumen is applied. Damp prevents the rolls from bonding properly. If there is damp, the roof must be dried first, and you may need other steps to remove damp before bitumen.
Bitumen roof waterproofing in nearby areas
















